Search
Now showing items 1-2 of 2
Evaluating the structural capacity of concrete elements through in-situ instrumentation
(2013)
The difficulty in predicting the long term load capacity of concrete elements is well documented. Time dependent effects such as creep and shrinkage coupled with varying loading events, particularly during construction, ...
Real-time monitoring of a hybrid precast and in situ concrete flat slab system
(2014)
This paper presents a scheme developed for instrumentation and monitoring of the structural performance of a hybrid precast and in situ concrete flat slab system employed in an educational building. The system contains a ...