| dc.contributor.author | Rodgers, Michael | |
| dc.contributor.author | Healy, Mark G. | |
| dc.contributor.author | Prendergast, John | |
| dc.date.accessioned | 2012-07-26T10:25:34Z | |
| dc.date.available | 2012-07-26T10:25:34Z | |
| dc.date.issued | 2006-03 | |
| dc.identifier.citation | Rodgers, M., Healy, M. G. & Prendergast, J. (2006) 'Nitrification in a vertically moving biofilm system'. Journal of Environmental Management, 79 (3):242-246. | en_US |
| dc.identifier.issn | 0301-4797 | |
| dc.identifier.uri | http://hdl.handle.net/10379/2921 | |
| dc.description | Journal article | en_US |
| dc.description.abstract | A laboratory continuous feed biofilm reactor, comprising a bulk fluid reactor, a biofilm plastic module, a feed tank, and pneumatic devices and controls, was operated for a total period of 257 days, including seeding time, to treat domestic-strength synthetic wastewater under increasing ammonium nitrogen (NH4+-N) loading rates, ranging from 0.17 +/- 0.01 (0.71 +/- 0.06 g m(-2) d(-1)) to 0.70 +/- 0.02 kg m(-3) d(-1) (2.9 +/- 0.1 g m(-2) d(-1)). The biofilm plastic module was moved vertically in and out of the wastewater in continuous cycles. The maximum NH4+-N removal rate was reached during the maximum loading phase, when a NH4+-N loading rate of 0.70 +/- 0.02 kg m(-3) d(-1) (2.9 +/- 0.1 g m(-2) d(-1)) was applied to the system. During this loading period, the average NH4+-N removal rate was 0.30 +/- 0.10 kg m(-3) d(-1) (1.30 +/- 0.40 g m(-2) d(-1)). (c) 2005 Elsevier Ltd. All rights reserved. | en_US |
| dc.format | application/pdf | en_US |
| dc.language.iso | en | en_US |
| dc.publisher | Elsevier | en_US |
| dc.relation.ispartof | Journal of Environmental Management | en |
| dc.subject | Biological nitrogen removal | en_US |
| dc.subject | Vertically moving biofilm system | en_US |
| dc.subject | Wastewater treatment | en_US |
| dc.title | Nitrification in a vertically moving biofilm system | en_US |
| dc.type | Article | en_US |
| dc.date.updated | 2012-07-16T10:59:57Z | |
| dc.identifier.doi | DOI 10.1016/j.jenvman.2005.07.003 | |
| dc.local.publishedsource | http://dx.doi.org/10.1016/j.jenvman.2005.07.003 | en_US |
| dc.description.peer-reviewed | peer-reviewed | |
| dc.contributor.funder | |~| | |
| dc.internal.rssid | 1148605 | |
| dc.local.contact | Mark Healy, Dept. Of Civil Engineering, Room E210, Civil Engineering Building, Nui Galway. 5364 Email: mark.healy@nuigalway.ie | |
| dc.local.copyrightchecked | Yes | |
| dc.local.version | ACCEPTED |